Case Studies

casestudies

STEEL VS. CONCRETE CASE STUDY

flyerCISC Solutions Centre is pleased to share the results of a comparative case study that provides an in-depth analysis of a steel-framed solution versus a cast-in-place concrete alternative.

The reference project for this case study is a six storey commercial office building located in Ontario. The case study evaluates the impacts of selecting steel vs. concrete framing on the project’s entire construction cycle from concept and design to costing, construction and sustainability.

This case study marks the first in a series of comparative case studies that CISC will be working on. Click HERE to download